With length 20 ft, width 10 ft, depth 4 inch, gravel & aggregate comes to 2.47 cu yd — volume needed. It is reached in 3 steps, the last of which is 66.666667 / 27, and each one is printed on the page with its numbers filled in. The formula is the one published by National Stone, Sand & Gravel Association, not an approximation fitted to it.

Cubic yards and tons of gravel, sand, limestone or topsoil for an area at a given depth.

Formula and sources checked · How we check

Length 20 ft, Width 10 ft, Depth 4 inch, Material Gravel — 1.4 tons/cu yd

2.47 cu yd

Volume needed for the example below. Editing a field recomputes the calculator below; this figure holds the answer the page was loaded with.

It is written into the HTML rather than drawn by a script, so a search engine reading this page without running JavaScript still finds an answer.

Volume needed
2.47 cu yd
Volume
20 * 10 * (4 / 12)66.667 cu ft
Volume in cubic yards
66.666667 / 272.469 cu yd
Weight to order
2.4691358 * 1.43.457 tons

Several at once

A job is rarely one of anything. Work out the first, add it, change the figures and add the next — the list keeps what each line was, and totals them.

Ask about this in the chatGravel Tonnage by Depth Chart

Worked example

A 20 × 10 path at 4 in deep is 2.47 cubic yards, or 3.5 tons of gravel. Suppliers quote and deliver by the ton, so the tonnage is what you phone in — and compaction takes about 20% out of loose depth, so order for the depth you want after tamping.

How to work it out yourself

  1. 1.Measure the area in feet and the depth in inches.
  2. 2.Divide depth by 12, multiply by length and width for cubic feet, then divide by 27 for cubic yards.
  3. 3.Multiply cubic yards by the density of the material to get tons — this is what the quarry sells by.
  4. 4.Add about a fifth for compaction if the depth you measured is the finished, tamped depth.

How far one cubic yard goes

A cubic yard is 27 cubic feet. Spread one inch deep it covers 324 square feet, and every other depth is that figure divided by the depth in inches — which is the whole table in one sentence.

Area covered by one cubic yard at each depth
DepthSquare feetSquare yards
1 in32436.0
2 in16218.0
3 in10812.0
4 in819.0
6 in546.0
8 in414.5
10 in323.6
12 in273.0

Cubic yards for a given area

Cubic yards needed by area and depth
Area1 in2 in3 in4 in6 in8 in10 in12 in
100 sq ft0.310.620.931.231.852.473.093.70
200 sq ft0.621.231.852.473.704.946.177.41
500 sq ft1.543.094.636.179.2612.3515.4318.52
1,000 sq ft3.096.179.2612.3518.5224.6930.8637.04

Suppliers deliver in whole or half yards, so round up — a truck will not bring 2.37.

Bags to the cubic yard

Bags of each size that make one cubic yard
BagHoldsBags per yard
Mulch, 2 cu ft bag2 cu ft14
Mulch, 3 cu ft bag3 cu ft9
Topsoil or compost, 1 cu ft bag1 cu ft27
Concrete mix, 80 lb bag0.6 cu ft45
Concrete mix, 60 lb bag0.45 cu ft60
Concrete mix, 40 lb bag0.3 cu ft90

Concrete is sold by weight and the yield is printed on the bag, which is why it takes 45 of the 80 lb bags to make a yard rather than the dozen people expect. Past about ten bags, ready-mix is cheaper and far less work.

Depth by use

Usual depth for each use, with the reason
UseDepthWhy
Mulch, established beds2–3 inDeeper than 3 in holds water against stems and starves roots of air.
Mulch, new beds over bare soil3–4 inThe extra inch is what suppresses weeds for a season.
Topsoil over an existing lawn0.25–0.5 inAny more and the grass underneath is smothered rather than fed.
Topsoil for a new lawn4–6 inRoots need the depth once, at the start; it cannot be added later.
Gravel walkway2–4 inOver a compacted base, not over soil.
Gravel driveway, surface course3–4 inOver 6 to 8 in of compacted base.
Gravel driveway, full build8–12 inBase and surface together, laid and compacted in layers.
Concrete patio or walkway4 inFour inches is the ordinary residential slab. Follow the specification for anything carrying a vehicle.

How much extra to order

What to add for compaction, settling and spillage
ReasonAddNote
Compaction, crushed stone20%Six inches loose settles to about five. Order for the finished depth.
Settling, mulch and soil10–15%Organic material shrinks as it breaks down over the first season.
Spillage and uneven ground5–10%A hole is never the rectangle it was measured as.
Concrete, sub-base variation5–10%A slab poured half an inch deep over 200 sq ft is a third of a yard nobody ordered.

Volume and tonnage for a 20 × 10 area by depth

03.77.42 Depth: 1.2 cu yd3 Depth: 1.9 cu yd4 Depth: 2.5 cu yd6 Depth: 3.7 cu yd8 Depth: 4.9 cu yd12 Depth: 7.4 cu yd212Depth (inch)
Volume and tonnage for a 20 × 10 area by depth
Depth (inch)Volume neededVolumeWeight to order
21.23 cu yd33.33 cu ft1.73 tons
31.85 cu yd50 cu ft2.59 tons
42.47 cu yd66.67 cu ft3.46 tons
63.70 cu yd100 cu ft5.19 tons
84.94 cu yd133.33 cu ft6.91 tons
127.41 cu yd200 cu ft10.37 tons

Depth in inches, for gravel at 1.4 tons per cubic yard. Other materials scale by their own density.

What does it cost?

Typical price is $20–$60 per ton. Picked up at the quarry. Delivery is usually a flat trip charge plus tonnage, so small orders cost far more per ton.

Typical prices per ton, as of 2026
ItemTypical price
Crushed stone / gravel$20–$55 per ton
Sand$15–$45 per ton
Topsoil, screened$20–$60 per ton
Delivery trip charge$60–$200 per load

Price ranges as of 2026. Materials pricing moves — treat these as a sanity check on a quote, not as a quote.

The formula

  1. Volume20 * 10 * (4 / 12)
  2. Volume in cubic yards66.666667 / 27
  3. Weight to order2.4691358 * 1.4

Source: National Stone, Sand & Gravel Association, USGS Mineral Commodity Summaries — construction aggregates

Questions people actually ask

Cubic yards or tons — which do I order in?
Tons, almost always. Quarries sell by weight because loose volume varies with moisture and grading. The cubic yard figure tells you the hole is deep enough; the tonnage is what you buy.
How much depth do I lose to compaction?
Roughly 20% for crushed stone under a plate compactor. Six inches of loose material settles to about five, so order for the finished depth plus a fifth.
Why does material change the tonnage?
Density. The same cubic yard is 1.1 tons of topsoil but 1.5 tons of crushed limestone — a 36% difference on the delivery ticket for an identical hole.

Related

Part of a job

Read first

  • What a Concrete Patio Costs — Materials, delivery and labour for a slab, and where the price actually moves: on a small pour the concrete is rarely the largest of the three figures.
  • What a Gravel Driveway Costs — Which stone actually compacts, how deep each layer goes, and why the cheapest load is the expensive one once it has to be dug out and replaced two years later.

Put this calculator on your site

Free, no attribution required beyond the link.

<iframe src="https://rulecalculators.com/embed/gravel-aggregate" width="100%" height="420" style="border:1px solid #e7e4de;border-radius:12px" title="Gravel & Aggregate Calculator"></iframe>
Did this answer your question?